Laying Shingles in Roof Valleys

Laying shingles in roof valleys is a critical step in ensuring a durable, weather-tight roof. Valleys channel rain runoff where two roof planes meet, making proper shingle installation essential to prevent leaks and ice dams. This article explains best practices, tools, common mistakes, and maintenance tips to help homeowners and roofers achieve a reliable valley installation.

Preparation And Planning

Proper preparation starts with inspecting the roof structure, ensuring the deck is solid and free of rot. Confirm valley location, orientation, and shading, which influence shingle selection and installation method. Gather materials including the correct shingles, underlayment, valley flashing, nails or staples, roofing cement, and a utility knife. Decide on a valley type—open, closed, woven, or batten—based on roofing style, climate, and manufacturer guidance. Adhering to local building codes and manufacturer specifications minimizes warranty issues and performance risks.

Valley Configurations And Their Implications

Open valleys feature metal flashing exposed along the valley and are common with asphalt shingles in many regions. They offer excellent water shedding but require precise flashing installation to prevent leaks. Closed or woven valleys provide a neater appearance, with shingles interwoven over a fabric or underlayment to form the valley line. Woven valleys demand careful shingle alignment to avoid bulk at the center. Bathed or fabric-backed valleys use a fabric membrane to separate shingles, reducing risk of leaks in harsher climates. Each method has trade-offs in durability, ease of installation, and maintenance needs.

Tools And Materials

Essential tools include a chalk line, utility knife with sharp blades, roofing hatchet or hammer, pry bar, tin snips for flashing, a caulk gun, a magnetic nail finder, and a pry bar. Materials consist of the chosen shingles, valley underlayment or self-adhering membrane, valley flashing (galvanized steel or aluminum), roofing nails, roofing cement, and sealant compatible with shingles. A quality ladder, fall protection, and weather monitoring are critical for safety and scheduling installations around dry days to prevent moisture intrusion.

Leaking or Storm Damage? Talk to a Local Roofer Today.
Same-day options · Licensed & Insured · Free local estimates
Call Now: 877-570-4119

Step-By-Step Installation Process

The following sequence applies to most asphalt shingle installations with open or closed valleys and can be adapted per manufacturer instructions. Always consult product guides before starting.

  • Prepare The Roof Surface: Remove old shingles as needed, repair damaged sheathing, and install an appropriate underlayment or membrane on the valley area according to the chosen configuration.
  • Install Valley Flashing: In open valleys, install metal flashing along the valley center, securing with fasteners spaced per manufacturer recommendations. In closed valleys, flashing is often less prominent but still essential at the edges to channel water effectively.
  • Lay Underlayment Or Membrane: For open valleys, a continuous underlayment may extend into the valley to complement flashing. For woven or closed valleys, lay a valley membrane that provides a clean surface for shingle seams and reduces capillary action that can draw moisture.
  • Install Shingles On The Sides: Begin with the shingles on one roof plane, maintaining proper overhang at the eave. Align edge shingles toward the valley line, leaving a small overhang to shed water away from the valley. Cut shingles at the valley edge as needed for a clean fit.
  • Centerline Alignment: When dealing with valleys, avoid placing heavy bundles directly over the center. Ensure each course is aligned symmetrically to minimize wrinkling and buckling at the valley.
  • Integrate Shingles Into The Valley: For open valleys, bend the shingle tabs into the valley and fasten at the sides, maintaining a straight valley line. For woven valleys, interlace shingles along the valley so they lay flat without creating high ridges at the valley center.
  • Seal And Finish: Apply roofing cement at irregular joints or around penetrations to prevent seepage. Ensure final shingle rows crest the valley properly and that sealant does not ooze onto visible surfaces.

Common Mistakes And How To Avoid Them

Avoid these frequent errors that compromise valley performance. Overlapping seams too aggressively can trap moisture and cause cracking. Improper nailing—nails placed too high or too low—can lead to lifting in wind or water infiltration. Ignoring manufacturer guidelines for underlayment or flashing lengths can void warranties. Inconsistent alignment creates a wavy valley that collects debris and promotes leaks. Plan for wind uplift in exposed areas by using additional fasteners and follow exact spacing as per product data sheets.

Weather And Seasonal Considerations

Install valleys in dry, moderate conditions whenever possible. Extreme cold can make shingles brittle and prone to cracking during cutting, while heat can soften asphalt, increasing the risk of pinching and misalignment. In regions with freeze-thaw cycles, ensure proper sealant cure times and use compatible materials that resist cracking under thermal stress. Consider timing work to minimize rain exposure, which can damage underlayment and delay sealing of valley components.

Maintenance, Inspection, And Repairs

Regular inspection of roof valleys is essential for longevity. After storms, check for lifted shingles, damaged flashing, or exposed underlayment. Look for signs of water stains on ceilings or attic condensation, which may indicate valley leaks. Clean debris from valleys to prevent moisture retention and ice dam formation. If damage is found, replace affected shingles promptly and reseal flashing joints. For aging roofs, consider professional assessment to determine if valley components require upgrading or complete re-flashing.

Safety Considerations

Roof work demands appropriate safety gear: non-slip footwear, a harness if working on steep pitches, and a stable ladder setup. Use fall protection systems when working higher than a typical balcony height. Avoid working in windy, wet, or icy conditions, and ensure all tools are secured to prevent drops. If the roof deck shows signs of significant damage or rot, address structural concerns before continuing with shingle installation.

Frequently Asked Questions

  • What is the best valley type for asphalt shingles? Open valleys with metal flashing are common and durable; closed valleys offer a cleaner look but require careful shingle weaving and flashing planning.
  • Can I lay shingles directly over old valleys? It depends on the existing roof system and manufacturer guidance. In many cases, removing old shingles and inspecting the valley is advisable to ensure proper sealing and performance.
  • How long does valley installation typically take? For a standard roof section, plan several hours to a full day depending on pitch, valley length, and crew size.